Daugavpils hydroelectric power station

Daugavpils hydroelectric power station
Location of Daugavpils hydroelectric power station
Country Latvia
Location Daugavpils
Coordinates
Status cancelled
Owner(s) Latvenergo
Power station information
Primary fuel Hydropower
Generation units 10
Power generation information
Maximum capacity 300 MW
As of 23 December 2010

The Daugavpils hydroelectric power station was a proposed hydro power project in Daugavpils, Latvia. It was to have 10 individual turbines[1] with a nominal output of around 30 MW which will deliver up to 300 MW of power.

The proposed dam became the rallying point for protest in 1986–87 by hundreds of thousands of Latvians resulting with the cancellation of the project, in spite of the vast expenditures already poured into the project.